Unpacking; Installing The Weighing Pan And Associated Components; Installing A Device With Analytical; Draft Shield - Sartorius Entris BCE Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 83
Installation
5.3

Unpacking

Procedure
Unpack the device .
t
CAUTION Glass breakage due to the incorrect handling
t
of the device! Do not lift the device by the draft shield .
Only lift the device by its base .
Install the device at the intended installation site .
t
If the device is stored temporarily: Observe the storage
t
information (see Chapter 13 .1, page 35) .
Keep all parts of the original packaging, e .g . to return the
t
device .
5.4
Installing the Weighing Pan and Associated
Components
5.4.1
Installing a Device with Analytical Draft Shield
Procedure
5.4.2
Installing a Device with Round Draft Shield
Procedure
Place the cover of the draft shield onto the round glass ring .
t
16
Entris
®
BCE Operating Instructions
Fully open the side panel
t
of the analytical draft
shield .
Fit the pan support on the
t
pan retainer and place the
weighing pan on top .
Place the base of the draft
t
shield into the round
recess on the device .
Fit the pan support on the
t
pan retainer .
Place the weighing pan
t
onto the pan support .
Place the round glass ring
t
on the base of the draft
shield .
5.5

Acclimatizing the Device

When a cold device is brought into a warm environment:
The temperature difference can lead to condensation from
humidity in the device (moisture formation) . Moisture in the
device can lead to malfunctions .
Procedure
Allow the device to acclimatize for approx . 2 hours at the
t
installation site . Ensure that the device is disconnected
from the power supply during that time .

Hide quick links:

Publicité

Table des Matières
loading

Table des Matières