Installation
5
Installation
5 . 1
Scope of Delivery
Item
Device
Weighing pan
Frame draft shield
Power supply unit with country-specific
AC adapters
Shock absorber
Operating Instructions
5 .2
Selecting an Installation Site
Procedure
Make sure that the following conditions are met at
t
the installation site:
Condition
Characteristics
Ambient conditions
Suitability tested (see
Chapter 14.1, page 46 for
ambient conditions)
Setup surface
− Stable, even surface with
− Sufficient space for the
− Sufficient load-bearing
5 .3
Unpacking the Device
Procedure
Unpack the device .
t
Install the device at the intended installation site .
t
We recommend keeping the original packaging to
t
return the device securely and appropriately, e .g . for
repairs .
34
Entris
II Advanced Line Operating Instructions
®
Quantity
1
1
1
1
4
1
little vibration
device (for space
requirements, see
Chapter "14 . 1 0 Device
Dimensions", page 49)
capacity for the device
and peripheral devices
(see Chapter "14 . 1 2
Metrological Data",
page 50for device
weight)
5 .4
Removing the Transport Lock
Procedure
1
5 .5
Mounting the Device
Procedure
5 .6
Acclimatizing
When a cold device is brought into a warmer area: The
temperature difference can lead to condensation of
humidity in the device (moisture formation) . Moisture in
the device can lead to malfunctions .
Procedure
Allow the device to acclimatize for approx . 2 hours at
t
the installation site . Ensure that the device is
disconnected from the power supply during that
time .
Remove the
t
transport locks (1)
and retain them for
later use .
Place the frame
t
draft shield (3) on
1
the balance .
2
Attach the four
t
3
shock absorbers (2) .
Place the weighing
t
pan (1) on top .