Moving And Unpacking; Setting Up - Nordcap 161 SOFT Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 92
Once the machine has been received, it must be moved to the place where it will be installed:
Before moving
Make sure that nobody is within
the lifting and load movement ope-
ration radius and, in particularly
difficult situations, use personnel
who control the movements to be
1
carried out.
Control the route
Avoid bumpy routes, paying atten-
tion to the dimensions and possible
protruding parts.
3
5
Damages that the machine may suffer during transport and moving are not covered by the GUARANTEE. Repair and replace-
ment of parts that may get damaged must be paid for by the client.
Before the first start-up:
Washing and sanitisation
It is recommendable to carry out ca-
reful cleaning and sanitisation of the
machine. (See Cleaning section)
1
3.Installation
Lift the cover
Try not to damage the
packaging as it could be
used again in the future.
3.Installation

3.2 Moving and Unpacking

Lifting and moving
Moving the machine must be done
by at least two people in a vertical
position.
2
Cut the nylon straps
It is prohibited to make additional
cuts in the packaging.
4
6
Parameter Configuration
Configure the parameters required.
Consult "Settings" section.
2
Placing
In the established
place and to con-
nect to the network.

3.3 Setting up

EN_
ES_
11

Publicité

Table des Matières
loading

Table des Matières