Installation; Requirements For Installation - Parker Ecodrain ED3002 Notice D'utilisation

Purgeur a condensat electronique
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation

All work at the pipelines and on the electrical components must be carried
out by authorised and suitably qualified technical personnel.
Notes on power supply with instable voltage:
We recommend that you use 24VDC units with appropriate power
supplies in operating environments with heavily fluctuating mains
voltages or high frequency interference (short voltage peaks or
voltage drops). This will ensure reliable long-term operation even
where unfavourable power conditions prevail.

Requirements for installation

For proper installation of the condensate drain, the operator must provide the
following:
Connections and lines for the infeed and outlet of the condensate.
All lines and connections must be correctly dimensioned (diameter). For a list
of correct connecting diameters, please refer to the technical data.
All lines and connections must be adjusted to the actual operating pressure.
Use only ball valves as shut-off valves.
Ensure that the condensate drain is connected to the correct mains voltage.
Basic requirements for installation
When installing the condensate drain, observe the following general instructions:
Avoid bypasses!
If condensation occurs at
several points, each
affected device must be
drained through a separate
drainage device. Otherwise,
there is an undesired flow
through the bypass line.
Ecodrain ED3002–ED3100_FR-EN_7
incorrect
English
correct
21

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ecodrain ed3004Ecodrain ed3007Ecodrain ed3030Ecodrain ed3100Ecodrain ed sérieEcodrain ed3002 série ... Afficher tout

Table des Matières