Transportation, Installation, Initial Operation; Packing; Transportation Of The Machine; Installation / Space Requirements - Parker Parflange 1050 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 58
Parflange 1050
5.
Transportation, Installation, Initial
Operation
5.1

Packing

The machine is packed onto a special
wooden stillage for transportation and
delivery. The machine can be transported
with the aid of a crane or a fork lifter.
• Store all parts of the original packing
material in case it becomes necessary to
return the machine for some reason.
• Attach all facilities intended for
conveyance. Secure all parts to prevent
them from slipping and damage.
5.2
Transportation of the
• Disconnect / remove all connected
cables and loose / mobile parts before
transporting the machine
• The doors must be locked before
despatching
• When transporting the machine with a
fork lifter, please insert the fork into the
guiding appliance of the housing.
If the fork lifter lifts the machine
transversely, this may tumble
over.
• When transporting the machine by crane,
use the four marked shoulder points to
take it up and lift it with four sling ropes
of the same length.
• When using a feeder, it must be
disassembled before transportation.
5.3
Place the machine on its four wheels and
pull the fastening brakes to guarantee a
stable position.
If you are working very long tubes, you
Machine
must provide a support for the tube ends.
The dimensions of the machine are
height:
width:
depth:
The space requirements depend on the
shape and length of the tubes.
36
Installation / Space
Requirements
Note!
The machine must only run in
closed and dry rooms.
The underground should be
level and horizontal.
The machine can be pushed to
the different work places within
the workshop hall.
1300mm
800mm
880mm
Fastening brakes

Publicité

Table des Matières
loading

Table des Matières