TF20 ASSEMBLY STEP 4
TF20
ARC
WASHER (E)
ONLY
8.4 mm
Qty: 6
TF20 ONLY
CONSOLE BASE
CONSOLE CABLES
CONSOLE MAST
BASE FRAME COVER
SCREWS (M)
BASE FRAME
20
HARDWARE FOR STEP 4 :
SPRING
BOLT (A)
WASHER (B)
20 mm
8.2 mm
Qty: 6
Qty: 6
NOTE: This step is for TF20 models only.
Open HARDWARE FOR STEP 4.
A
SCREW (M)
20 mm
Gently place CONSOLE BASE on top of
B
Qty: 4
CONSOLE MASTS.
NOTE: Be careful not to pinch the console
BOLTS (A)
cables while attaching the console base.
SPRING WASHERS (B)
ARC WASHERS (D)
Connect the CONSOLE CABLES and tuck
C
them inside the CONSOLE MASTS and slide
CONSOLE BASE into CONSOLE MASTS.
Connect the CONSOLE BASE to CONSOLE
D
MASTS using 6 ARC WASHERS (E), 6
SPRING WASHERS (B) and 6 BOLTS (A).
NOTE: Tighten all bolts from STEPS 1–3.
Attach BASE FRAME COVERS to BASE
E
FRAME using 4 SCREWS (M).