End Of Service Measures; Overhaul Instructions - RAMSEY WINCH HD-P 42,2 Traduction Des Instructions Originales

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

END OF SERVICE MEASURES

When winch reaches the end of it's serviceable life,
dispose of per local environmental regulations.
INSTRUCTIONS FOR OVERHAUL HD-P 42,2
SERIES WINCH
Take note of mounting configurations for proper
mounting of parts during re-assembly. Replace all
gaskets, o-rings, and seals during re-assembly.
Disconnect tube (item #41) from elbow fittings (items
#24) on bottom of end bearing and counterbalance
valve (item #42). Remove motor (item #27) from end
bearing by slowly unscrewing capscrews (items #18).
CAUTION: MOTOR IS UNDER SPRING PRESSURE.
Check breather vent (item #45). Make sure it is not
clogged. If oil is leaking from vent, check brake o-rings,
backup rings, and sealing surfaces (see page 10).
Remove springs (items #40) from pockets and inspect for
damage. Replace gasket (item #25).
Remove coupling (item #23) from end bearing. Examine
coupling for signs of wear, replace if necessary. If
necessary, remove counterbalance valve from motor by
removing capscrews (items #14).
Remove retaining rings (items #39 and #48) with
screwdriver.
Remove brake parts from end bearing. NOTE
POSITION OF O-RINGS AND BACKUP RINGS
BEFORE REMOVAL. Examine brake discs (items
#4) and stators (items #3) for signs of wear, and
replace if necessary.
Examine o-rings (items #28 and 29) and backup
rings (items #31 and 33) in brake piston (item #5),
as well as o-ring (item #30) and backup ring (item
#32) in backup brake piston (item #6) for signs
of wear. Remove o-rings and backup rings from
grooves in brake piston or backup brake piston and
replace if necessary.
Remove tie plates (items #11) from end bearings
by unscrewing capscrews (items #15). Slide motor
end bearing (item #8) and drum (item #1) from gear
housing end bearing.
Remove input shaft (item #10) from end bearing.
Inspect shaft and output sun gear (item #7) for damage and replace if necessary. To remove the output sun
gear, remove the snap rings (items #38) and thrust washer (item #44) and pull off the end of the shaft.
Remove bushing (item #13) and o-ring (item #34) from motor end bearing. Place new, well-oiled o-ring into
groove inside of end bearing and press new bushing onto end bearing.

OVERHAUL INSTRUCTIONS

6
18
22
27
24
21
41
42
14
39
31
29
6
48
5
28
33
30
32
8
13
34
11
1
15
25
23
40
24
45
4
3
15
11
10
7
44
38

Publicité

Table des Matières
loading

Table des Matières