Mounting - Fronius Acctiva Seller Instructions De Service

Masquer les pouces Voir aussi pour Acctiva Seller:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 93

Mounting

NOTE!
Danger due to improper installation of the charger in a switch cabinet (or in a simi-
lar enclosed space).
This can result in damage to property.
The space requirement dimensions in mm (inches) illustrated below are given to ensure
that there is easy access to the plug connections:
Space requirements with edge protector
Space requirements without edge protector, and space requirements with signal lamp and bracket options (*
space for mounting/removal)
Ensure sufficient heat dissipation using forced-air ventilation.
There should be a clearance of 10 cm (3.94 in.) all around the device.
247 (9.72)
233 (9.17)
6,5
(.26)
270
(10.63)
100
(3.94)
15,5
(.61)
88 (3.46)
126 (4.96)
53

Publicité

Table des Matières
loading

Table des Matières