Commissioning The Bus Coupler - Aventics EtherNet/IP Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 79
70
AVENTICS | EtherNet/IP™ | R412012728–BDL–001–AC
Commissioning and Operation

7.5 Commissioning the bus coupler

Before commissioning the system, the following steps must have been carried out
and completed:
You have assembled the valve terminal and the bus coupler
(see "Assembling the valve system with bus coupler" on page 51).
You have connected the bus coupler (see "Connecting the bus coupler electrically"
on page 52).
You have made the presettings and configured the system (see "Making settings"
on page 58 and "Configuring the bus coupler" on page 62).
You have configured the bus master so that it controls the valves and the input
module correctly.
You have carried out the diagnostic test on the input/output modules
(see "Testing and diagnosis on the modules" on page 68).
Commissioning may only be carried out by qualified electrical or pneumatic
personnel or an instructed person under the direction and supervision
of qualified personnel (see "Personnel qualifications" on page 45).
Risk of uncontrolled actuator movements when the pneumatics are switched on
Danger of injury if the system is in an undefined state and the manual overrides
are not set to position "0".
Put the system in a defined state before switching it on.
Set all manual overrides to position "0".
Make sure that no personnel are within the hazardous zone when the pressure
is switched on.
Also observe the applicable instructions and safety information in the
VS operating instructions.
1. Switch on the operating voltage.
2. Check the LED displays on all modules.
3. Switch on the compressed air supply.
CAUTION

Publicité

Table des Matières
loading

Table des Matières