Télécharger Imprimer la page

Valor Charlton & Jenrick PE2 Serie Instructions D'installation page 9

Masquer les pouces Voir aussi pour Charlton & Jenrick PE2 Serie:

Publicité

With 549AFBv2/AFPv2—Windsor Arches
7. Fasten the outer arch to the side brackets with two
machine screws on each side and secure with nuts
from the back of the arch.
8. Push the appliance into position in the cavity hook-
ing the anti-tipping hook bracket into its fl oor part at
the rear.
9. Install the fuel bed in the fi replace—see appliance
and fuel bed's installation manuals.
Viewed from
the rear
Rear corner of the
appliance in the cavity
10. Hook the inner arch to the side brackets.
11. Slide the ash pan door below the inner arch.
9

Publicité

loading

Ce manuel est également adapté pour:

Charlton & jenrick pe2cbk