Télécharger Imprimer la page

Valor Charlton & Jenrick PE2 Serie Instructions D'installation page 6

Masquer les pouces Voir aussi pour Charlton & Jenrick PE2 Serie:

Publicité

With 536CXBI—President Front
11. At the back of the Presidet cast front, remove the
existing hooks.
12. Secure the two new hooks provided with the
PE2CBK to the back of the cast front with two
screws provided.
13. OPTIONAL. If using a closure plate, discard the side
brackets it came with. Place the plate on the appli-
ance over top of the top baffl e and against the wall
fi nish.
NOTE: There is no method of securing the closure
plate to the PE2 appliance. It will be sandwiched in
place by the cast front when hooked to the PE2.
14. Hook the cast front to the side brackets' inner tabs
installed on the PE2 fi replace, pressing the closure
plate (if used) against the wall fi nish.
15. Place the cast top on top of the front locating it so it
is stable.
6

Publicité

loading

Ce manuel est également adapté pour:

Charlton & jenrick pe2cbk