Télécharger Imprimer la page

Valor Charlton & Jenrick PE2 Serie Instructions D'installation page 12

Masquer les pouces Voir aussi pour Charlton & Jenrick PE2 Serie:

Publicité

With 263RCB—Richmond Front
7. Fasten the outer cast surround to the new side
brackets, just installed on the appliance, with two
machine screws per side (provided)
and secure with nuts on the back of
the bracket/surround.
8. Push the appliance into position in the cavity hook-
ing the anti-tipping hook bracket into its fl oor part at
the rear.
9. Install the fuel bed in the fi replace—see appliance
and fuel bed's installation manuals.
Because our policy is one of constant development and improvement, details may vary slightly from those given in this publication.
Designed and Manufactured by / for Miles Industries Ltd.
190 – 2255 Dollarton Highway, North Vancouver, B.C., CANADA V7H 3B1
Tel. 604-984-3496 Fax 604-984-0246
www.valorfi replaces.com
12
Viewed from
the rear
Rear corner of the
appliance in the cavity
10. Place the inner cast frame against the outer sur-
round where it will be held with magnets.
11. Slide the ash pan door below the inner cast frame.

Publicité

loading

Ce manuel est également adapté pour:

Charlton & jenrick pe2cbk