Noise Emission; Contents Of Delivery; Transport And Start Up; Transport And Installation - Jet JDR-34 Mode D'emploi

Masquer les pouces Voir aussi pour JDR-34:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Number of speeds
Range of speeds
500 - 2500 rpm
Weight
Mains
230V ~1/N/PE 50Hz
Motor Power
375W (0,5 HP) S1
Reference current
Laser class 2
<1mW, 400-700nm
Extension cord (H07RN-F):
Installation fuse protection
Mains
400V ~3L/PE 50Hz
Motor Power
375W (0,5 HP) S1
Reference current
Laser class 2
<1mW, 400-700nm
Extension cord (H07RN-F):
Installation fuse protection
JDR-34F:
Spindle to column
Spindle travel
Spindle taper
Head tilt
Chuck capacity
Column diameter
Table size
Table tilt
Base size
Distance chuck to table
Distance chuck to base
Overall L/W/H
830/320/1660mm
Number of speeds
Range of speeds
500 - 2500 rpm
Weight
Mains
230V ~1/N/PE 50Hz
Motor Power
375W (0,5 HP) S1
Reference current
Laser class 2
<1mW, 400-700nm
Extension cord (H07RN-F):
Installation fuse protection
Mains
400V ~3L/PE 50Hz
Motor Power
375W (0,5 HP) S1
Reference current
Laser class 2
<1mW, 400-700nm
Extension cord (H07RN-F):
Installation fuse protection

4.2 Noise emission

Acoustic pressure level
(according to EN ISO 11202):
Idling at maximum speed
LpA 70,4 dB(A)
The specified values are emission
levels and are not necessarily to be
seen as safe operating levels.
As workplace conditions vary, this
information is intended to allow the
user to make a better estimation of the
hazards and risks involved only.
5
4.3 Content of delivery
Machine base
39 kg
Column and bracket assembly
Head assembly
Table assembly
3 A
3 down feed handles
16mm keyless chuck
3x1,5²
MT-2/ B16 arbor
10A
Chuck guard
Drift key
Cross laser
Operating tools
1,5 A
Assembly kit
Operating manual
4x1,5²
Spare parts list.
10A

5. Transport and start up

155-415mm

5.1 Transport and installation

80mm
The machine is designed to operate in
MT-2
closed rooms and must be placed
45°R/90°L
stable on firm and levelled surface.
1-16mm
73mm
The machine must be bolted down!
dia 300mm
For packing reasons the machine is
+/- 90°
not completely assembled.
280x480mm
max 650mm
1200mm

5.2 Assembly

5
If you notice transport damage while
unpacking, notify your supplier
58 kg
immediately. Do not operate the
machine!
Dispose of the packing in an
2,5 A
environmentally friendly manner.
3x1,5²
Clean all rust protected surfaces with a
10A
mild solvent.
With the aid of a second person,
carefully lift the head onto the column
1,5 A
top.
Caution:
4x1,5²
The head assembly is heavy! Use
10A
care when lifting onto the column!
Insert the pressure plate (B, Fig 1)
before assembly!
Rotate the head assembly until the
sides of the belt cover are parallel with
the sides of the base.
Fig 1
Firmly tighten clamping knob (H, Fig
5).
Chuck guard Assembly
Fig 2
Install the E-stop switch box onto
head, with M6x25 hex cap screws (a,
Fig 2)
Remove knurled bolt (b, Fig 2)
Remove M3 pan head screw (c, Fig 2)
Insert the chuck guard (d, Fig 2)
Fig 3
Install M3 pan head screw (c, Fig 3)
Install knurled bolt (b, Fig 3)

5.3 Mains connection

Mains connection and any extension
cords used must comply with
applicable regulations.
The mains voltage must comply with
the information on the machine licence
plate.
The mains connection must have a
10 A surge-proof fuse.
Only use power cords marked H07RN-
F
Connections and repairs to the
electrical equipment may only be
carried out by qualified electricians.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Jdr-34fJdr-34-mJdr-34-tJdr-34f-mJdr-34f-t

Table des Matières