Télécharger Imprimer la page

Parkside Performance 445977 2307 Traduction Des Instructions D'origine page 59

Publicité

3. Sharpen only from the inside to the out-
side.­Guide­the­file­from­the­inner­side­
of the cutting teeth to the outer side. Lift
the­file­when­you­are­withdrawing­it.
4.­ Sharpen­first­the­teeth­on­one­side.­Turn­
the saw around and sharpen the teeth
of the other side.
5. The chain is worn and must be re-
placed by a new saw chain if only
approx.­4­mm­of­the­cutting­teeth­is­
remaining.
6.­ After­the­sharpening,­all­cutting­elements­
must now be equal in length and width.
7.­ After­every­third­sharpening,­the­sharp-
ness­depth­(depth­limitation)­must­be­
checked­and­the­height­filed­with­the­
aid­of­a­flat­file.­The­depth­limitation­
should be set back about 0.65 mm
from the cutting tooth. After the setting
back­of­depth­limitation,­round­it­off­a­
little at the front.
Adjusting the chain tension
The adjustment of the chain tension is de-
scribed in the chapter "Assembly - tension-
ing chainsaw".
•­ Switch­off­the­device­and­remove­the­
battery­(16)­from­the­device
•­ Check­the­chain­tension­regularly­and­
re-adjust this as often as possible.When
the saw chain is tensioned with 9 N
(approx.­1­kg),­the­gap­between­the­
saw chain and the guide rail may not
be more than 2 mm.
Starting up a new saw chain
In­the­case­of­a­new­chain,­the­tensioning­
force­decreases­after­some­time.­Therefore,­
you have to re-tension the chain after the
first­5­cuts­and­no­later­than­after­10­min-
utes' sawing time.
Approved saw chains:
Oregon­90PX056X,
Trilink CL14356TL
never attach a new chain to a
worn drive pinion or place onto
a damaged or worn chain bar. The
chain could spring back or break,
potentially leading to serious injury.
Maintaining the chain bar
Use cut-protection gloves
when handling the chain or
the chain bar.
1. Switch off the device and remove the
battery­(16)­before­carrying­out­any­
maintenance work.
2. Remove the sprocket chain wheel cov-
ering­(13),­the­saw­chain­(6)­and­the­
chain­bar­(7).
3.­ Check­the­chain­bar­(7)­for­wear.­Re-
move burrs and straighten the guide
surfaces­with­a­flat­file.
­ If­the­blade­bar­is­damaged,­replace­
it. Approved blade bars:
Oregon­164MLE041(112329),
Trilink M1431656-1041TL.
4. Clean the oil passages (
chain­bar,­in­order­to­29­a­trouble-free,­
automatic oiling of the saw chain dur-
ing operation.
5.­ Mount­chain­bar­(7),­chainsaw­(6)­and­
sprocket­chain­wheel­covering­(13)­
and tighten the chainsaw.
With the oil nozzles in good condi-
tion and the oil regulator set cor-
rectly,­the­saw­chain­will­spray­a­
little oil off after starting.
GB
MT
­28),­of­the­
59

Publicité

loading

Produits Connexes pour Parkside Performance 445977 2307

Ce manuel est également adapté pour:

Ppksa 40-li b2