4. Put the extended piece of the component barrier
and behind the gas hose
5. Put the cover
supply.
a. Align the louvers in the cover with the
fan
.
6
b. Make sure that none of the cables are
pinched.
6. Install the handle as follows:
a. Align the handle
the cover.
b. Put the ends of the handle below the
edges of the front and rear panels
c. Install the 2 screws
handle and cover to the plasma
power supply.
7. Install the 2 screws
bottoms of the front and rear panels to
the plasma power supply.
Powermax45 XP and Powermax45 SYNC
.
4
on the plasma power
5
with the holes in
7
that attach the
9
that attach the
10
Field Service Bulletin
RS-485 Serial Interface Receptacle with PCB
above the power cord connection points
3
3
9
8
.
8
10
809930
4
9
7
5
8
6
10
11