EN
6.5.3
Setting the liquid level for submersible probe 2
1. Display the menu "Tankdaten 02".
2. Proceed as described in chapter "Setting the tank volume, tank height
and liquid level".
6.6
Zero calibration of the submersible probe
Verify that the submersible probe is in air.
Verify that the submersible probe is connected to the control unit.
Verify that mains voltage is connected and switched on.
1. Set the value "Current level" to the value "000000 mm²" (see "Setting the
tank volume, tank height and liquid level").
2. The zero point of the submersible probe has been saved.
34
TankControl 10
Commissioning