Télécharger Imprimer la page

afriso TankControl 10 Notice Technique page 73

Masquer les pouces Voir aussi pour TankControl 10:

Publicité

Les langues disponibles

Les langues disponibles

5.3
Mounting additional submersible probe (optional)
Mount the first submersible probe in the first tank and the second submersi-
ble probe in the last tank. Establish the electrical connection of the second
submersible probe (see "Connecting an additional submersible probe
(optional)").
5.4
Mounting the floating probe (optional)
The floating probe is mounted in such a way that it is suspended in the tank.
The height at which the float switch of the floating probe is mounted corre-
sponds to the alarm switching point.
1. Suspend the floating probe into the tank at the cable.
2. Fasten the cable of the floating probe with the enclosed G1 screw fitting
at the height/level of the required alarm switching point.
Mounting
TankControl 10
EN E N
23

Publicité

loading