ENGLISH
8.
INSTALLATION
8.1.
Packaging And Unpacking
Move and install the appliance respecting the
information provided by the manufacturer, shown
directly on the packaging, on the appliance and in
this manual.
The lifting and transportation system of the
packaged product envisages the use of a fork-lift
GB
truck or a pallet stacker, using which particular
attention must be paid to balancing the weight in
order to prevent the risk of overturning (avoid
excessive tilting!).
!
ATTENTION: When inserting the lifting
device, pay attention to the gas supply pipe and
the position of the feet.
!
ATTENTION: given the presence of weights
concentrated in the high part of the appliance, do
not drag the appliance during movements (tipping
hazard and damage to feet).
The packaging is made of cardboard and the
pallet of wood. A series of symbols is printed on
the cardboard packaging which highlights, in
accordance with international standards, the
provisions which the appliances must be subject
to during loading, unloading, transportation and
storage.
8.2.
Installation
All the installation phases must be considered,
from the moment of creation of the general plan.
The installation area must be equipped with all
power supply and production residue drainage
connections and must be suitably lit and respect
current laws regarding hygiene and sanitary
requirements.
To optimise consumption and reduce wear of the
machine, do not position it in the vicinity of heat
sources or in environments where temperatures
are too high.
TOP
FRAGILE
HANDLE WITH
CARE
On delivery, check that the packaging is intact and
has
not
suffered
transportation.
Any damage must be notified to the transportation
company immediately.
The appliance must be unpacked as soon as
possible to check that it is intact and undamaged.
Do not cut the cardboard with sharp tools in order
to
prevent
damage
underneath.
Pull the cardboard packaging upwards.
After having unpacked the appliance, check that
the features correspond to those requested in the
order;
For
any
anomalies,
immediately.
!
Packaging
polystyrene foam, staples ...) must not be left
within reach of children.
Remove the protective PVC film from the internal
and external walls, avoiding the use of metal
tools.
Inside the cooling compartment, guides for
the tray are located at the bottom.
Proceed with appliance levelling, acting on the the
individual feet.
!
This appliance can only be installed and
operate
in
rooms
ventilated, in order to guarantee correct operation.
Connect and leave for a certain period of
time
(at
least
2
functioning. During transport it is probable that the
20
DO NOT
EXPOSE TO
HUMIDITY
any
damage
during
to
the
steel
panels
connect
the
dealer
elements
(nylon
bags,
which
are
permanently
hours)
before
checking