!
Always ensure that the machine is switched off prior to charging.
The battery meter displays the charge level of the batteries;
when fully charged, all meter lights are illuminated.
1
When the machine is getting close to empty the second light from
the end starts to flash, the operator should then take the machine to
a suitable charging point.
3
The large capacity gel batteries are sealed for life and are totally maintenance free.
The on-board charger automatically monitors the charging process and will switch off when the batteries are fully charged.
Insert the charging lead required for your country into the charging point.
The machine charging point is located to the rear of the machine under the control panel.
Connect to a suitable power supply.
Once mains power is connected the red charging indicator will illuminate.
To ensure a full charge, the machine should be left for a period of 8 hrs.
Once fully charged, disconnect the charging lead from both the power supply and the machine.
External Charging Point
Note: Only use the recommended charger and leads. Contact Numatic International Ltd for recommended charger and leads.
As the machine is used and the batteries are discharged,
the meter lights will go out from right to left.
If the battery-charge level is allowed to discharge to the
point that only the red light remains illuminated,
the operator must consider charging the machine.
2
ALWAYS ENSURE THE MACHINE IS
SWITCHED OFF PRIOR TO CHARGING.
Recharge batteries after each use,
regardless of machine operation time.
The machine charging point is located to
the rear of the machine under the control
panel.
Remove Isolator Plug and connect your
external charger.
Refit Isolator Plug before operating the
machine.
23
Machine Charging
!