TECHNOPOOL3
Dosing systems for swimming pools
Procedure to fill the electrolyte
ATTENTION: If the membrane holder cap (11) is removed when the ventilation hole (14) is not open,
the membrane is ruined!!!
Move the transparent ring (10) that covers the ventilation hole (14) downward (above the marking) with a
small screwdriver in order to open the hole.
Loosen the membrane cap (11) from the casing (7) of the measure cell
Move the transparent ring (10) once again into the groove in order to cover the ventilation hole.
Clean the membrane cover (11) and the cover (15 only for ADELCLJ15) under running water and dry
them.
Fill (11) and (15 only for ADELCLJ15) with the electrolyte supplied, making sure not to create air
bubbles.
Only for the ADELCLJ15 electrode: place the vertical probe and carefully push the measure electrode
into the cover (15).
Slowly loosen the membrane holder cap (11) from the casing (5) of the measure cell, for the excess
electrolyte to flow through the open valve.
Tighten the membrane cover securely. The O-Ring causes an initial resistance. When the membrane cover
is tightened completely, the measure cell must not knock against the membrane. This could damage it and
make it unusable.
ADSP7000570
rev. 1.6
only for ADELCLJ15
09/01/2014
APPENDIX 3
ENGLISH
65/136