Télécharger Imprimer la page

Ravelli MILD Manuel D'installation, D'utilisation Et D'entretien page 146

Publicité

Les langues disponibles

Les langues disponibles

ENGLISH
8 PRELIMINARY
PROCEDURES
8.1 PELLET LOADING
The first operation to do before turning on the
product is to fill the fuel hopper (pellet) preferably
using a special pan. Do not empty the bag directly
into the hopper to avoid loading in sawdust or
other foreign elements that could prevent the
appliance from working properly and to avoid
spilling pellets outside of the hopper.
Be sure the close the hopper lid well after having
loaded in the pellets.
8.2 CHECKS PRIOR TO SWITCHING ON
You have read and perfectly understood the
contents of this instructions manual.
Before lighting the stove, you must ensure that:
• the pellet tank is full;
• the combustion chamber is clean;
• the fire door seal and ash drawer are working
correctly;
• the electric plug is connected correctly;
• every element that could burn has been
removed (instructions, various stickers);
• If the fire pot is removable, make sure it is
positioned correctly in place.
If the flue pipe catches fire you must call the fire
brigade immediately.
8.3 ELECTRICAL POWER SUPPLY
Connect the appliance to the power mains, turn
on the power switch at the back of the appliance
by placing it on (I).
8.4 DOWNLOAD AND INSTALL THE
APPLICATION
An internet connection (2.4 GHz) is strongly
recommended.
The stove needs an application to be downloaded
from Play Store or App Store in order to work.
To download it, the name of the app is ApiFire
User, otherwise scan one of the two QR codes
based on what operating system you have.
ANDROID
S o m e s c r e e n s m a y c h a n g e d u e to t h e
advancement of the application version.
146
IOS
Once the application has been downloaded and
installed, proceed as follows.
Accept the suggested conditions while using the
App.
Fig. 8.1
Fig. 8.2

Publicité

loading