Télécharger Imprimer la page

CAME G2500N Manuel D'installation page 27

Masquer les pouces Voir aussi pour G2500N:

Publicité

Les langues disponibles

Les langues disponibles

Place the plate over the iron cage.
Fill the foundation frame with concrete. The base must be perfectly level with the bolts which are entirely above surface.
Wait at least 24 hrs for the concrete to solidify.
Remove the foundation frame.
Fill the hole with earth around the concrete block.
Remove the nut and washer from the bolts
Fit the electric cables into the tubes so that they come out about 600 mm.
Mounting

Publicité

loading

Ce manuel est également adapté pour:

G2500