MAINTENANCE LOG
Periodic maintenance
☞ Before doing any maintenance, cut off the power supply, to prevent any hazardous situations caused by accidental boom movements.
Periodic maintenance log kept by users (every six months)
Date
Extraordinary maintenance
⚠ The following table is for logging any extraordinary maintenance jobs, repairs and improvements performed by specialized contractors.
Any extraordinary maintenance jobs must be done only by specialized technicians.
Extraordinary maintenance log
Fitter's stamp
Job performed ________________________________________________________________________________________
___________________________________________________________________________________________________
______________________________________________________________________________________________
Fitter's stamp
Job performed ________________________________________________________________________________________
___________________________________________________________________________________________________
______________________________________________________________________________________________
Notes
Name of operator
Job performed on (date)
Technician's signature
Requester's signature
Name of operator
Job performed on (date)
Technician's signature
Requester's signature
Signature