Télécharger Imprimer la page

Monogram ZVC Serie Instructions D'installation page 18

Publicité

Les langues disponibles

Les langues disponibles

Installation
Instructions
ISTEP 21 CONNECT ELECTRICAL
Verify that power is turned
off at the source.
A WARNING:
if house wiringisnot
2-wire with o ground wire, on electrician
will need
to convert existing wiring to meet these specs.
When house wiring is aluminum,
be sure to use
U.L-opproved
anti-oxidant
compound
and
aluminum-to-copper
connectors.
1. Place insert sleeve on podded, yet stable, surface
below cutout (con use flattened
carton to pod
surface).
2. Remove the junction
box cover.
00000
\
i
OOOO,
O
\
Connect
4. Connect white leads to branch circuit white lead.
5. Connect block leads to branch circuit block lead.
6. Connect green/yellow
leads to branch circuit green
lead.
7. Secure oil connections
with wire nuts.
Wires
3. Pull house wires through
wall of insert sleeve and
attach the strain relief. Thread the house wire
through the junction
box.
00000
<2
Cover
Screws
8. Carefully push wires into junction
box and replace
cover.
9. Secure junction
box cover with original screws.
18

Publicité

loading