Télécharger Imprimer la page

TECO 36 TOP Manuel D'instructions page 110

Publicité

Les langues disponibles
  • FR

Les langues disponibles

- After having positioned on the tyre the bead presser roller, lock the bead pressing clamp
on the rim near (at approximately 3-4cm from the disc - Fig. 34c).
- Rotate the wheel until the clamp is at 5 o'clock position and Check that the portion of
the tyre bead (between roller and clamp) is inserted in the groove of the rim.
- If not, position the bead pressing tool at 3 o'clock to press the bead into the rim grove.
- Restart the rotation to complete the mounting phase.
- Remove clamp, bead pressing tool, lever-less head and bead presser roller.
- Set the bead breaking unit to the rest position
9.7. TYRE INFLATION
9.7.a. SAFETY INDICATIONS
110
• RISK OF EXPLOSION
• Never exceed tyre pressure recommended by tyre manufacturer.
• Always match the tyre and rim dimensions.
• Take care to avoid any damage to the tyre.
• During inflation, keep outside the vertical cylinder area occupied
by the wheel.
DANGER
34c
User's manual

Publicité

loading