Télécharger Imprimer la page

Güde DHH 1050/7 TCW Traduction Du Mode D'emploi D'origine page 14

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 18
Installation of operating arms and splitting cross
Operating arms
1
2.
Put the holding pin through before the cross coupling.
3
Splitting cross installation
1
3.
Apply the splitting cross and turn the fixation bolt in the knife recession until the
nut is tightened.
1.
Fit the operating arm and insert the tube in the cross coupling recession.
Mazání
tukem
TIP: Lubricate the sheet couplings with grease from above and from below!
2
3.
Set the clamping plates to the corresponding wood diameter.
4
1.
Screw the fixation bolt half to the splitting cross.
2
2a
4.
Secure the holding pin with a cotter at the
bottom (included in the supply).
2.
Screw the nut (included in the supply) to
the inner side.
14
3

Publicité

loading

Ce manuel est également adapté pour:

01996Dhh 1050/8 tc01963