Mechanical Installation; Control Pad - Bodet Style 5S Manuel D'installation Et De Mise En Service

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

II - Mechanical installation
Choose a position to install the clock, preferably away from sources of electrical interference, such
as transformers. The data network must be PoE (802.3af, class 3):
if not, use a PoE injector to
power the clock.
Proceed to the configurations requiring the use of touches «SELECT» and «+» (see page 15)
before any mechanical installation.

2.1 Control pad

- Wall hanging: fix the control panel to the chosen location, by means of 2 ankles and 2 screws.
2.2 Style 5S Hôpital
- Wall hanging: fix the clock to the chosen location, by means of 4 ankles and 4 screws.
Do not corner cables during this operation.
- Make the configuration and the regulation of luminosity of the clock.
- Remove the sheet of protection of the facade, and clean the clock by means of the antistatic cloth.
16

Publicité

Table des Matières
loading

Table des Matières