Converting from one gas type to another
The boiler is supplied to operate with natural gas (G20) or LPG
(G30/G31) according to the specifications on the technical data
plate.
However, it may be converted from one type of gas to another by
using the special kits available on request.
- Natural gas conversion kit
- LPG conversion kit
9
This conversion procedure must only be carried out by the
Technical Assistance Service or by personnel authorised, also
once the boiler has been installed.
9
For information on assembly, please refer to the instructions
supplied with the kit.
9
After converting the boiler, it must be adjusted again. Follow
the instructions in the relevant paragraph and apply the new
identification data plate supplied in the kit.
- Turn off the power to the boiler and shut off the gas valve
- Remove the following in sequence: case, air chamber cover and
combustion chamber cover
- Disconnect the spark plug wire
- Unscrew the burner screws
- Remove the cable gland from the air chamber and remove the
burner with the spark plug attached
- Using a box spanner or fork wrench, remove the nozzles and
washers and replace them with those supplied in the kit
9
Use and fit the washers supplied in the kit only, even for
manifolds without washers.
- Refit the burner in the combustion chamber and tighten the
screws securing it to the gas manifold
- Position the cable gland with the spark plug wires on the air
chamber
- Reconnect the spark plug wire
- Refit the combustion chamber cover and the air chamber cover
- Remove the cover to access the jumpers
10
- To convert from natural gas to LPG, wire in the jumper at position
JP3
- To convert from LPG to natural gas, remove the jumper from
position JP3
- Turn the boiler on again and reopen the gas valve
- Adjust the boiler as explained in the chapter "Adjustments". This
must be done exclusively by the Technical Assistance Service.
- Refit the cover
- Apply the adhesive gas identification label supplied in the kit (red
for LPG or yellow for natural gas) to replace the previous version
- Refit the case.
Adjust the boiler as described in the chapter "Adjustments",
referring to the data for LPG.
9
The conversion procedure must be carried out exclusively by
qualified technicians
9
On completion of conversion, apply the new ID data plate
supplied in the kit.
4.10

Boiler cleaning

Before cleaning, disconnect the electric power supply by switching
the main system switch to "OFF".
External cleaning
Clean the casing, the control panel, the painted parts and the
plastic parts with damp, soapy cloths.
For stubborn stains, dampen the cloth with a 50% water and
denatured alcohol mixture, or use specific products.
0
Never use fuel and/or sponges soaked in abrasive solutions or
powder detergents.
Internal cleaning
Before cleaning the inside:
- Shut off the gas valves
- Close the system taps.
4.11
Cleaning the water tank (fig. 14)
After removing the flange it will be possible to inspect and clean
inside the water tank and check the condition of the magnesium
anode.
- Turn off the hot water system stopcock and empty the water tank
through the drainage device (fig. 13)
- Loosen the nut and extract the anode (1)
- Remove the nuts (2) blocking the external flange (3) and extract
it
- Clean the inside surfaces and remove all the debris through the
opening
- Check the wear conditions of the magnesium anode (1), replace
if necessary
- Check that the gasket (4) is in good condition after extracting it
from the inside flange (5), replace if necessary.
Complete the work of cleaning, re-mount the components working
the other way round to above description.