Regular Maintenance/Service By Trained Personnel - BWT AQA total Energy 5600 Instructions D'installation Et D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN
Implement the reset procedure:
I. Disconnect the mains plug and
wait approx. 5 – 10 seconds.
II. Reconnect the display mains
plug while keeping the reset
button pressed down (+).
III. Only let the (+) button go when standby appears
on the display.
standby
Channel 1 2 3 4 5
IV. If the yellow lamp on the slave lights up or flashes
after the refill replacement, a system error is
probably present. Rectify the error as follows:
1. Enter the code key:
Press the "M" button to switch to the mode where set-
tings can be made in the electronic control system.
You will be requested to enter the code. Press the
"C" button so that you can enter the code.
Code
(-key)
000
ok =
Use the "+" button to change the value of each num-
ber in the 3 digit numerical code. Use the "C" button
to move to the next number in the 3 digit numerical
code.
Code
369
ok =
The 3 digit numerical code is: 369
Confirm your entry with the "-" key.
The numerical code authorizes you to change set-
tings in the AQA total unit. Please remember that
incorrect settings can reduce the performance of the
unit. The code should therefore be stored safely and
protected against unauthorized access.
IV.) Menu control
Use the "-" button to go forward in the menu
or the "M" button to go back.
30
M ←
-
(+/c)
M ←
-
(+/c)
After the refill replacement (usually, all of them), this
action must be confirmed to the electronic control
system.
I.) Navigate through the menu until the following
text appears in the LC display:
Refill
II.) Press the "C" button
Refill(s)
all
III.) Use the "+" button to select which refill was
replaced. Normally all refills are replaced.
IV.) Confirm the refill replacement with the "C"
button.
V.) After a moment, the unit switches back to the
operating mode and is fully functional.
Display on standby or operation goes out.
If the red „Check System" lamp does not go out af-
ter commissioning or if the green „Operation" lamp
does not light up during water consumption, a sys-
tem error is given.
7.2. Regular maintenance/service by trained
personnel
The system must be maintained by trained personnel
at regular intervals (a six months interval is recom-
mended) to ensure functionality of the system. We
recommend you to have a maintenance contract
with our customer services or with your expert in-
staller.
← M-→
← M-→
=C

Publicité

Table des Matières
loading

Table des Matières