Instant Product Supply - Saeco NEXTAGE CAP010 Mode D'emploi Et D'entretien

Machine automatique à expresso et boissons chaudes
Masquer les pouces Voir aussi pour NEXTAGE CAP010:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English
Pour the pre-ground coffee (max 2 measuring scoops) into
the duct.
Select
pre-ground
product and leave the
pre-ground coffee door
open.
If
the
beverage is selected with
the
door
machine will enable the
coffee
units' operation and a
double dose of coffee will
be
used
coffee dose + fresh ground
coffee dose). As a result,
nothing will be brewed.
When the operations involving the use of pre-ground coffee
are complete, close the door. The coffee grinders/dosing
units will be enabled again and the "heart" icons will
disappear from the pictures of the coffee-based beverages.
82
the
desired
coffee-based
coffee-based
closed,
the
grinders/dosing
(pre-ground
7.4

Instant product supply

Remove the container cover.
Pour the instant product into the container.
Close the container cover.

Publicité

Table des Matières
loading

Table des Matières