SWITCHBANK S1 OFF
DON'T ADD 1 HS PUMP W/HTR
230V 1ϸ
DON'T ADD 2 HS PUMPS W/HTR
1x32A
DON'T ADD 4 HS PUMPS W/HTR
SPECIAL AMPERAGE RULE A
LIST OF SECTION, DISTANCE AND POWER REQUIRED
To determine the section of the electrical installation leads, see the values given in the,
before mentioned, Electrical Specifications together with the following table:
2,1
Distance
6 - 11 m
2,5
11 - 15 m
2,5
15 - 20 m
4
For greater distances increase the cable section proportionally.
There may be configurations which require the installation of 1 line of 16 A, 1 line of 32 A to
cover the power required by the Spa.
The configuration options of the electrical panel are given further on in this Manual.
Please remember that the installation and electrical configuration changes can only
be performed by qualified people and always following the current regulations in each
country.
The manufacturer is not liable, under any circumstances, for damage caused by incorrect
installation or performed by non-qualified people.
ATTENTION
Bear in mind the position of the maximum consumption Switch.
If you do not use cable suitable for the distance and power of the Kit, it will not
work properly and may cause overheating in the electrical circuits with the
risk of an electrical accident. Always use the cable with a section suitable to
maximum consumption. In the event of doubt between two values, always use
the cable with greater section.
To connect the power supply of the Kit, locate the free packing gland at one end of the
Automatic - Manual Selector panel.
14
2,5
2,8
3,2
Nominal section of the cable in mm
2,5
2,5
2,5
2,5
4
4
4
4
6
SWITCHBANK S1 ON
ADD 1 HS PUMP WITH HEAT
A2
ADD 2 HS PUMPS WITH HEAT
A3
ADD 4 HS PUMPS WITH HEAT
A4
SPECIAL AMPERAGE RULE B
A5
KW required
3,5
4,4
5,3
4
4
6
4
6
6
6
6
10
6,2
7,0
7,9
2
10
10
10
10
10
10
10
10
16
8,8
10
10
16