Electrical Interfaces; Initial Commissioning - resideo Braukmann KaltecSoft Instructions D'installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 25

Electrical interfaces:

The emission of interference (EMI = voltage peaks, high-
frequency electromagnetic fields, interference voltages,
voltage fluctuations...) by the surrounding electrical systems
may not exceed the maximum values specified in EN 61000-
6-3.
Data analysis of the hard water in your area:
Continuous operation of the water softener with water
containing chlorine or chlorine dioxide is possible if the
concentration of free chlorine/chlorine dioxide does not
exceed 0.5 mg/l
The type of pre-treatment must be determined individually
Principle of intelligent regeneration:
The unit should be sized according your current water
consumption
If water consumption is reduced, e.g. during holidays, the
softener should be isolated and bypassed during this period
of inactivity
When reinstating operation after a period of inactivity a shut-
off device must be fully opened for at least 5 minutes before
water can be used again
Inlet and outlet connections:
When installing the unit, select a location where the unit can
easily be connected to the water supply network.
A connection to the waste water system (at least DN 50), a
floor drain and a separate mains socket (see technical data)
must be nearby.
Overflow hose connection:
A suitable overflow hose connection is required to remove the
waste water.
Exclusion of warranty:
Non-compliance with the installation conditions and the
operator responsibilities voids the warranty.
Guarantee:
In the event of a malfunction of the unit during the guarantee
period, please contact your aftersales service department
and quote the model type and the production number (see
technical data or the rating plate on unit).
Note:
Only your local after-sales service staff may perform any
works under the guarantee. Any work performed by a
third party must be directly commissioned by your
aftersales service.

3.2 Initial commissioning

For professional installation by a qualified fitter.
Has all packaging material (C) (see figure below)
been removed from the brine cabinet?
Is there a protective filter upstream from the unit in the
immediate vicinity?
Is the water and power supply to the unit continuous
(water network pressure of at least 1 bar)
Have you opened the pressure reducing valve to the
limit stop?
MU1H-1420 GE23 R0420
GB
Have the water hoses been properly connected?
(Observe the flow direction arrows on the multiblock
and on the device). Have the drain water hose and the
overflow been routed separately to the waste water
system and connected? (See Installation Guidelines)
Have you informed the operator of the inspection
schedule? (Check supply of salt and hardness of
blended water (downstream from the device) at least
every two months)
Have you informed the operator of the maintenance
schedule? (Tasks in accordance with manufacturer's
instructions. Interval annually)
Please check connections and pipeline junctions for leaks.
Handing over the unit to the operator:
If there is a delay between the installation/start-up of the unit
and transfer to the operator, a manual regeneration must be
performed.
The operator must be told how the unit works as well as how
to operate and inspect it.
Ensure that the operator receives the installation and
operating manual.
Please open the access cover (1) see
1.
Salt storage container
2.
Brine cabinet
3.
Fixing material (not seen)
4.
Rating plate and serial number
3.3 Installation and operation
considerations
1.
Before you begin
WARNING!
All electrical and plumbing installations should be
performed by qualified person in accordance with
all local codes.
WARNING!
The start-up must be performed by a qualified
person only.