Preparations; Installation Site; Factory Settings - Stiebel Eltron DHE 18 SLi 25 A Instructions D'utilisation Et De Montage

Chauffe-eau instantané à régulation entièrement électronique
Masquer les pouces Voir aussi pour DHE 18 SLi 25 A:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 42
INSTALLATION

Preparations

9.
Preparations
f Flush the water line thoroughly.
f
Taps/valves
f Use suitable taps (see chapter "Appliance description / Acces-
f
sories"). Open taps are not permitted.
A safety valve is not required.
Note
Never use the cross-piece to reduce the flow rate. It is
intended to shut off the appliance.
Permissible water pipe materials
- Cold water inlet pipe:
Galvanised steel pipe, stainless steel pipe, copper pipe or
plastic pipe
- DHW outlet pipe:
Stainless steel pipe, copper pipe or plastic pipe
Material damage
!
If plastic pipework systems are used, take into account
the maximum inlet temperature and the maximum pres-
sure (see chapter "Specification / Data table").
Flow rate
f Ensure that the flow rate (see chapter "Specification / Data
f
table", On) for switching on the appliance is achieved.
f Increase the mains water pressure if the required flow rate is
f
not achieved with the draw-off valve fully opened.
Flexible water connection lines
f If the appliance is installed with flexible water connection
f
lines, ensure that the pipe bends do not become twisted.
Pipe bends have a bayonet fitting and are installed inside the
appliance.
f Secure the back panel at the bottom with an additional
f
screw.
9.1

Installation site

Material damage
!
Install the appliance in a room free from the risk of frost.
f Always install the appliance vertically near the draw-off
f
point.
The appliance is suitable for undersink and oversink installations.
Note
The appliance must be fitted to a wall with sufficient
load-bearing capacity.
www.stiebel-eltron.com
Undersink installation
1 Cold water inlet
2 DHW outlet
Oversink installation
2
1 Cold water inlet
2 DHW outlet
9.2

Factory settings

The appliances are prepared in the delivered condition:
- Power supply from below, installation on unfinished walls
- Water connection, installation on unfinished walls
- For the appliance with connected load changeover, the aver-
age connected load is preset.
1
2
1
DHE SLi |
29

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dhe 18 sliDhe 21 sliDhe 24 sliDhe 27 sli

Table des Matières