Dibo JMB-MG Mode D'emploi page 128

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

E N
O P E R AT I O N
1 low pressure coupling
2 high pressure coupling
3 reel
18 R E E L S
The JMB will be standard equipped with a high pressure/low pressure hose
reel. Always secure/block the reel(s) after use and before transporting the trailer.
Please note for possible heat danger to the high pressure coupling of the reel(s)
at the use of a burner. Always unroll the reel hose(s) completely during spraying
activities to ensure an optimal performance!
• Disconnect the low pressure coupling: loosen ring to the left, disconnect the
coupling, tighten the ring back to the right for the water connection. Connect
the low pressure coupling again: Loosen ring (left), lock the coupling, tighten
the ring to the right.
• Disconnect the high pressure coupling: loosen the plastic coupling to the
right. Put the hose coupling on the high pressure gun and lance. Lock back
the coupling by turning to the left.
1
19 S U P P O R T A R M
The support arm is mounted at the back, underneath the trailer on the light bar.
Pulling out the support arm can be done by the red handle, the support arm
folds now, set the support arm fixed to the ground by the central bolt (circled in
red on photo 3) and with aid of a wheel bolt/crank.
Pull back the red handle and push the support arm upwards to return to fold.
On soft ground, suitable sheet/plate material has to be laid under the supports.
Watch out for the crossover point of the support
arm at a filled/unfilled water tank.
Pay also attention to compensation of the spring on the
axles. If the supports are lowered completely, they will take
the entire weight of the load and can become damaged.
20 P R E S S U R E VA LV E
The pressure control valve has a fixed default setting, this is not adjustable.
21 S O F T E N E R P U M P ( O P T I O N )
The trailer is also equipped with a softener pump and softening tank (5 litres),
they are situated on the support plate above the battery. These pump ensures
that the softening product will be pumped to the coil of the burner if the burner
is put into operation (if there's a flame). This to prevent scale deposits to the
burner (coil). See also the manual for the operation of the dosage pump!
• Basic settings softener pump: turn the regulating screw to second position
(2th indication, see mark on the picture left -> 1 liter = 5h 5 mins.) at water
hardness of 20° F when using the DiBO recommended anti scale product
(3.8550.650).
• Softener pump range: 85 ml -> 600 ml/hour.
• Possible options:
DiBO 22
2
3

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

1.780.290

Table des Matières