ProMinent DULCOTEST CLB1-mA-10ppm Guide De Montage Et De Service page 42

Sonde pour le chlore libre
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Commissioning
6
Commissioning
CAUTION!
The sensor may not be operated in
water or solutions contained tensides!
Do not switch off the measuring
system during intermittent operation!
A run-in time will be necessary fol‐
lowing operation without chlorine.
Switch on metering equipment with a
time delay if necessary!
If no chlorine is metered for a long
period of time, then the sensor has to
be disconnected from the mains
power supply and stored in a dry
place.
Run-in time
The sensor requires a specific run-in time to
show a steady displayed value.
Initial commissioning:
Recommissioning:
Membrane / electro‐
lyte replacement:
42
1 - 3 h
0.5 - 2 h
approx. 0.5 h
6.1
Calibration
CAUTION!
Following the replacement of a mem‐
brane cap or electrolyte, the gradient
has to be calibrated!
The gradient has to be calibrated at
regular intervals to ensure the perfect
operation of the sensor! Calibrating
the sensor every 3-4 weeks suffices
with swimming pool or potable water.
Avoid air bubbles in the sample water,
which can result in incorrect metering!
Air bubbles, which adhere to the sen‐
sor'''s membrane can result in too low
a reading and thus lead to over-
metering.
Please note the pertinent national
guidelines for calibration intervals!
Prerequisites
Constant flow rate at the flow gauge
Constant temperature of the sample
water
Identical temperature of sample water
and sensor (wait approx. 15 minutes)
The sensor has been run-in
Constant pH value

Publicité

Table des Matières
loading

Table des Matières