10.1 Completing the installation

f Fit the lower part of the back panel. Ensure that it clicks into
f
place.
f Align the appliance by carrying out the following: Loosen
f
the fixing toggle and align the power supply and back panel.
Retighten the fixing toggle. If the back panel of the appliance
is not flush. the appliance can be secured at the bottom with
an additional screw.

10.2 Alternative installation methods

- Power supply from above for unfinished walls
- large cross-section for power supply from below
- Connecting a load shedding relay
- Water installation for finished walls
- Water installation for finished walls with solder/compression
fitting
- Water installation on finished walls. fitting the appliance cap
- Installing lower part of back panel
- Use of existing mounting bracket when replacing an
appliance
- Installation for offset tiles
Power supply from above for unfinished walls
f Cut off the cable grommet for the power cable.
f
f Push down and remove the locking hook that secures the
f
mains terminal. then remove the mains terminal.
f Reposition the mains terminal from the bottom to the top.
f
Secure the mains terminal by pushing it under the locking
hook.
www.stiebel-eltron.com
Conductor cross-sections for power supply from below
If cables with a large cross-section are used. the cable grommet
can be fitted after the appliance has been installed.
1.
3.
f Before installing the appliance. use a screwdriver to push the
f
cable grommet out.
f Push the cable grommet over the power cable. In the case
f
of a cross-section > 6 mm². enlarge the hole in the cable
grommet.
f Push the cable grommet into the back panel and click grom-
f
met into place.
Connecting a load shedding relay
Install the load shedding relay in the distribution board in conjunc-
tion with other electric appliances. e.g. electric storage heaters.
The relay responds when the instantaneous water heater starts.
The load shedding relay is available as an accessory.
Material damage
!
Connect the phase that switches the load shedding relay
to the indicated terminal of the mains terminal in the
appliance (see chapter "Specification / Wiring diagram").
Water installation for finished walls
Suitable pressure-tested taps can be ordered as accessories.
1 Water plugs