11 Commissioning
11.1 General information on using MPS systems and stations
The systems and stations of the MPS are supplied as follows:
Fully assembled
Individually adjusted and ready for use
Pre-commissioned
Tested
When stations are combined, the mechanical setup, as well as sensor positions and
settings, may have to be changed.
Commissioning is normally limited to visual inspection in order to ensure correct tubing connections, wiring,
and operating voltage supply.
All components, tubing connections and wiring are clearly identified, so that all of the connections can be
readily restored.
11.2 Mechanical commissioning
If the Distributing Pro and Joining stations are operated with other downstream stations, the stoppers at the
end of the conveyor module have to be removed.
Setup as individual station,
stopper at end of conveyor is installed
© Festo Didactic 8129446
403-1 System, Distributing Pro-Joining-Sorting Inline – Operating instructions
Setup with downstream station,
stopper at end of conveyor is removed
39