EN
1.4
Burner installation
For the installation of the burner to the generator, follow to the diagram shown below:
Fig. 3 Burner installation
* The burner is arranged to receive the light oil feeding pipes from right side, left side, upward or down word indifferently.
– Fix the flange (pos.4) to the boiler door (pos.1) through the washers (pos.5) and the screws (pos.6), putting in the middle the
insulating sheet (pos.2).
– Then put the burner on the flange (pos.4) and tighten the screw (pos.3).
– After finishing the installation, verify that the burner is lightly inclined (see A).
14