Briggs & Stratton infohub 6517-00 Instructions D'installation page 6

Moniteur de surveillance sans fil

Publicité

Les langues disponibles

Les langues disponibles

Install Relay Wire
1. Locate the supplied relay wire in the kit. Determine the
length of wire needed and cut two pieces. Strip the
four ends prior to installation.
2. Insert one end of each wire into the N.O. and COM
terminals at the 10-pin connector plug or terminal
block. Insert the other end of each wire into the
interface board by pressing the tabs on the relay
connector (B, Figure 5). Polarity does not matter.
Figure 6
Install 240V Splitter Harness (Air Cooled Units)
1. Locate the supplied 240V splitter harness in the kit.
2. Plug the 240V splitter harness into the battery warmer
connector (arrow, Figure 6).
3. Route the other end of the harness to the interface
board and connect it to the 240V splitter harness
connector (C, Figure 5).
Install 240V Splitter Harness
(Liquid Cooled Units)
1. Locate the supplied 240V splitter harness and the
supplied liquid-cooled adapter harness in the kit.
2. Connect the 240V splitter harness to the adapter
harness.
3. At the fuse block inside the generator, connect each of
the adapter harness wires to the spade terminals under
each fuse (arrow, Figure 7).
Figure 7
6
4. Route the other end of the harness to the interface
board and connect it to the 240V splitter harness
connector (C, Figure 5).
Install Pass-Through Harness
1. Locate the supplied pass-through harness in the kit.
2. Connect the pass-through harness to the control panel,
then route it to the interface board and connect it to the
pass-through harness connector (D, Figure 5).
Install Cellular Unit Harness
1. Locate the supplied cellular unit harness in the kit.
2. Connect the cellular unit harness to the cellular unit,
then route it to the interface board and connect it to the
cellular unit harness connector (E, Figure 5).
C
B
Figure 8
Verify the Installation
1. Compare your connections with Figure 8 to confirm
proper installation of the harnesses.
A - Generator harness connector from control board
B - Fault relay wire connector
C - 240V splitter harness connector
D - Pass-through harness connector
E - Cellular unit harness connector
2. Ensure all of these connectors are securely in place.
3. Route the generator wire harness on the control board
to the interface board and connect it to the generator
harness connector (A, Figure 5).
D
E
A
BRIGGSandSTRATTON.COM