Télécharger Imprimer la page

Briggs & Stratton infohub 6517-00 Instructions D'installation page 4

Moniteur de surveillance sans fil

Publicité

Les langues disponibles

Les langues disponibles

Installation
Thank you for purchasing this home standby accessory.
When installed according to these instructions, the
monitoring device will provide years of dependable service.
Keep your purchase receipt with this instruction sheet and
store with your other generator manuals after installation.
IMPORTANT: Illustrations used in this document are for
reference and may not represent the actual unit being
serviced. Your installation will be similar.
Before starting the installation, refer to Suggested infohub™
Installation Locations at the end of these instructions to
identify your particular type of generator. The preferred
mounting locations for the interface board (E) and the
cellular unit (G) will be shown in those illustrations.
Disconnect Power
WARNING Shock Hazard. Hazardous voltage from utility
service or generator could cause death or serious
injury. Remove all sources of supply voltage and
follow all disconnect power instructions prior
to performing any service work. Verify with a
meter that utility power has been disconnected.
Before performing any installation, maintenance, or service
on the generator, ALWAYS perform the following steps:
1. Set generator system switch to OFF.
2. Set generator circuit breaker to OFF.
3. Remove 15 Amp fuse from control panel.
4. Utility voltage is present at generator control
panel. Remove the fuses from the transfer switch to
disconnect power before servicing the control panel.
5. Disconnect negative battery cable from negative battery
terminal, indicated by NEGATIVE, NEG, or (-).
NOTICE: Only existing wire harness holes should be used to
route the infohub harness to the generator controller. Except
for the antenna cable hole, it is not necessary to drill other
access holes.
4
Drill Hole for Antenna Cable
1. Refer to Suggested infohub™ Installation Locations at
the end of these instructions to determine the mounting
location for the cellular unit.
2. Using a 3/8 inch bit, drill a hole into the enclosure near the
intended location of the cellular unit so that the antenna
cable will reach the unit (Figure 1). The hole should
be placed near the roof but not so close as to cause
interference when the roof is fully opened.
Figure 1
3. After drilling the hole, remove any burrs and metal
shavings from the enclosure to prevent rusting.
4. Apply a small amount of rust inhibitor to the inside and
outside of the hole edges and allow to dry.
Mount Antenna to Roof
1. Locate the supplied rubber grommet in the kit.
2. Carefully cut one side to the center of the rubber
grommet. Do not cut in half.
3. When the rust inhibitor is dry on the antenna cable
hole, slip the rubber grommet over the antenna cable,
feed the antenna wire through the hole, and fit the
grommet into the hole.
4A. Mount the magnetic antenna on the generator roof.
4B. For units with plastic or aluminum roofs, use the
supplied washer and adhesive tape
• Find a suitable location on the roof. This location
should be near the antenna cable hole.
• Remove the red adhesive protection film from the
washer and press firmly to the roof.
• Place magnetic antenna on to washer.
.
BRIGGSandSTRATTON.COM

Publicité

loading