Télécharger Imprimer la page

SICK LSI 101 Mode D'emploi page 143

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 81
LSI
1. Pre-commissioning test of the machine protective
device by qualified personnel:
The pre-commissioning test confirms compliance with the
-
safety requirements laid down in the national and
international regulations, in particular machinery and
equipment use directives (EC Declaration of Conformity).
Test of the effectiveness of the protective device on the
-
machine in all modes in which the machine is capable of
operating, based on the enclosed checklist.
The operating personnel of the machine protected by the
-
protective device must be instructed by specialist
personnel of the machine operating company before
beginning work. The said instruction is the responsibility of
the machine operating company.
Test your LSI system using the checklist reproduced in
section 6.2.
2. Routine testing of the protective device by qualified
personnel:
Test based on national regulations, at the intervals they
-
stipulate. These tests serve to reveal modification or
manipulations of the protective device relative to the initial
commissioning stage.
The tests must be conducted any time major modifications
-
are made to the machine or the protective device, as well
as whenever resetting or repair work is carried out in the
event of damage to the housing, front screen, connecting
cables, etc.
Test your LSI system using the checklist reproduced in
section 6.2.
8 008 308/M848/06-05-02 Operating Instructions · LSI
© SICK AG · Industrial Safety Systems · Germany · All rights reserved
GB
143

Publicité

loading