Control Surface Testing - Multiplex PARTENAVIA P.68 Instructions De Montage

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Control Surface Testing

Before each flight turn on the transmitter BEFORE connecting a fully
charged battery and perform a full pre-flight functional check-pay
Multiplex strongly recommends you also perform a full range
test prior to each flight!
ALWAYS CHECK CONTROL SURFACE DIRECTION FROM BEHIND THE MODEL LOOKING FORWARD TO ENSURE CORRECT OPERATION
Aileron control lever moving leftward
Elevator control lever moving upward
Rudder control lever moving leftward
attention to all control surfaces for correct direction of operation.
Note: SAFETY FIRST!! Please remove the propeller (where
applicable) before carrying out any pre-flight maintenance to
the power system to prevent potential injury from unintended
propeller operation.
Aileron control lever moving rightward
Elevator control lever moving downward
Rudder control lever moving rightward
Flaps deployed
EN
21

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

1-02488

Table des Matières