Arjohuntleigh Nimbus 4 Mode D'emploi page 15

Masquer les pouces Voir aussi pour Nimbus 4:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 173
Installing the Pump 1. If the pump is to be hung from the end of the bed,
Cable Management
6. Make sure the CPR control is closed and locked in
position and the Transport control is set to
NORMAL.
FAST DEFLATE
CPR Control
make sure that the bed bracket is securely attached
to the pump, and then attach the pump and bed
bracket to the bed frame.
2. Alternatively the pump can be placed underneath
the bed, either upright or lying on its back.
3. Insert one end of the mains power cable into the
receptacle on the pump.
4. Connect the other end of the mains power cable
into a suitable mains power outlet.
In order to prevent a trip hazard, the mains power cable
should be put through one of the cable management
flaps which are on each side of the mattress base cover,
as follows:
1. Locate one of the cable management flaps.
2. If necessary, open the press studs along the flap.
7
NORMAL
1
TRANSPORT
2
3
Transport Control
NORMAL
TRANSPORT

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Nimbus professional

Table des Matières