Technical Data; Putting The Machine Into Service; Instructions For Use - Grillo Climber 910 Guide D'utilisation Et Entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

TECHNICAL DATA 910

ENGINE: BRIGGS & STRATTON OHV two-cylinder petrol engine, 4-stroke, 21 HP.STARTING: electric,
12 V battery.
GEAR SYSTEM: hydrostatic transmission.
DIFFERENTIAL: with lock
CLUTCH: for P.T.O., electromagnetic
SPEED: 0 to 8 km/h with continuous variation + reverse from 0 to 4 km/h.
TYRES: front 13 x 50 - 6; rear 17 x 8.00-8.
STEERING WHEEL: with variable angle and height adjustment.
SEAT: spring - adjustable
CUTTING PLATE: with side / rear discharge.
TYPE: rotary, 1 blade.
CUTTING WIDTH: 91 cm.
CUTTING HEIGHT: from 30 mm to 120 mm. 4 different cutting positions and 1 transfer position.
HOURLY CAPACITY: 6000 m/h (guideline).
WEIGHT: Kg. 300.
CLIMBER 910 S VERSION
Differently from the other one it is fitted with the front brakes.
WEIGHT: Kg. 307.

PUTTING THE MACHINE INTO SERVICE

1) Check that the machine has not been damaged in transit.
2) Check the oil levels of the engine, hydrostatic transmission and final drive.
3) Check the tyre pressure:
1 BAR front wheels 13 x 50/6
1.5 BAR rear wheels 17 x 8.00-8.
4) Check the battery voltage; it must be at least 12 Volts. Charge if necessary.
If the battery has been supplied dry with the acid separate, to put it into service proceed as follows:
1) Add the acid and wait 2 hours.
2) Charge the battery with a battery charger set at 12 Volts on slow charge for 2 hours.
Caution; failure to follow this rule may cause deterioration of the battery and acid leaks during operation.
IMPORTANT!!! During assembly take care not to reverse the polarity of the battery.
BATTERY - CAUTION!
The gases released by the battery are explosive, keep it away from naked lights or sparks. Check the liquid
level periodically and keep the terminals lubricated with Vaseline grease.
RUNNING IN - CAUTION!!
Change the engine oil and filter after the first 30 working hours.
Change the wheell reduction oil after the first 130 working hours (80W90). Quantity 1,9 lt. (Fig. 11/A).
Check that there are no oil leaks or slack screws, especially those which fix the blade, the steering and
the wheels. Adjust the tension of the hydrostatic transmission belts.

INSTRUCTIONS FOR USE

Before starting up the engine, always check that:
– the engine oil level is correct (Fig. 2);
– the oil in the hydraulic motor is at the correct level (Fig. 3);
– the travel lever is in the idle position (2, Fig. 1/B);
– the engine cooling intake grilles are clean (Fig. 5);
– air filter is clean (Fig. 6).
– the mowing plate is clean;
– the hydraulic motor fins are clean (Fig. 7);
– the blades are sharp and firmly fastened in place;
– the screw in the centre of the blade hub is securely tightened (3, Fig. 1/C)
Fill the fuel tank using a funnel with very fine filter (4, Fig. 1/A).
10

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Climber 910s

Table des Matières