Removal Procedure; Display And Operating Instructions - AERMEC CC2 Manuel D'utilisation/Installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Fig. 3.8 illustrates a simple installation procedure of the centralized controller. Pay attention to the following aspects:
1.
Disconnect the power supply from the indoor unit before installation. The power must be disconnected throughout the
installation process.
2.
Do not damage the touch screen during installation.
3.
Take the following precautionary measures before installation:
If the centralised controller is wall mounted, drill a hole of 180 mm x 107 mm x 62 mm and apply 4 suitable connections,
according to fig. 3.9.
If the centralised controller is installed using the supplied metal box, make 4 holes for installation, according to fig. 3.10.
1
4.
In phase
, extract the power and communication cables and pass them separately from the wiring hole of the electrical
box's rear cover. Do not pass the cables from the same hole.
2
5.
In phase
, align the rear cover of the electrical box with the mounting holes on the wall with the ST4,2x16 FA screw.
6
6.
In phase
, extract the cables that connect the touch screen and the rear cover of the controller. Place the touch screen in a safe place.
7
7.
In phase
, connect the communication cables to terminals G1, G2 and connect the neutral cable and the voltage cable
to terminal N, L; connect the earth cables to position
screw.
8
8.
In phase
,place the rear cover of the controller on the rear cover of the electrical box with screw ST4,2x9,5 TC.
9
9.
In phase
, connect the cables between the touch screen and the rear cover of the controller.
3.4.

REMOVAL PROCEDURE

4.

DISPLAY AND OPERATING INSTRUCTIONS

on the rear cover of the electrical box. Secure them with the M4x12
Fig. 3.11 Removal diagram
Fig. 4.1 Main page
EN
31

Publicité

Table des Matières
loading

Table des Matières