GB Initial operation
4. Initial operation
4.1. Delivery status and initial operation
In delivery state the drive will, after the connection to the operating element, only
execute a moving interruption, which will be done twice at the first moving operation.
For the operation blocking springs/burglar proof fixations and fixed stoppers trailing
edges are mandatory.
Switch off the power supply and connect the drive to the switch.
Operation
Drive
If the running direction of the drive corresponds to 'Up' and
'Down' of the switch, initial operation is completed.
Perform a test run: The drive stops automatically at the end
positions and performs a short release.
Otherwise, switch off the power supply and swap the brown
and black connecting wires of the outputs of the switch. Initial
operation is completed.
Perform a test run: The drive stops automatically at the end
positions and performs a short release.
24