To connect sanitation facilities (no toilet) to the side inlets, proceed as follows:
Remove the blind cap which is screwed onto the inlet
connection and remove the black wedge-sealing ring
as well as the white pressure ring from the blind cap.
Plug the union nut (Pos. A), the pressure ring (pos. B)
and the black wedge-sealing ring (pos. C) into the DN
40 drainage pipe and slide it all the way into the container's
inlet opening. Attach the drainage pipe by tightening
the union nut on the inlet connection. The black wedge-
seal must be between the union nut and inlet connection
while you do this. Make sure that the supply lines have a
slope towards the container (see installation examples).
To connect a toilet to the Minilift F, proceed as follows:
The Minilift F features a connection in accordance with
DIN1387 / 1388 that is configured with an inlet
height of 180mm.
Set the toilet in front of the plastic box and slide the
toilet's connecting pieces into the facility's mounting
clamps. It is imperative to ensure that the lifting
system is not pushed in.
INSTALLATION AND START-UP
34/120
2016/04