Operation; Installation And First Operation - EKOM DK50 DS Manuel De L'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

OPERATION

4.
OPERATION

INSTALLATION AND FIRST OPERATION

Do not use the compressor immediately after unpacking as it will not
adjust to the ambient temperature.
Only qualified personnel can install the compressor and put it into
operation for the first time. The installer shall train the operating
personnel in the use and routine maintenance of the equipment.
Installation and training of personnel should be acknowledged by the
installer's signature on the installation certificate.
Prior to start-up, the four screws for transport stabilization must be
removed. If the compressor is switched on without removing the
stabilizers, the compressor could be permanently damaged.
The compressor does not contain a backup power supply.
Never block the air intake filter on the backside or the vent outlets on
the top of the equipment.
If the compressor is equipped with a main source of air, the standby air
source must be available.
ANY MODIFICATION OF THIS EQUIPMENT IS FORBIDDEN!
If this equipment is used nearby other instruments, the equipment must
be observed in order to verify normal operations in the configuration it
will be used.
Instruments may be affected electro-magnetically!
You may notice a "new product" odour when you first place the
product into service (for a short period of time). This odour is
temporary and does not impede the normal use of the product. Ensure
the space is properly ventilated after installation.
BEFORE FIRST USE REMOVE PROTECTIVE COVER OF THE SWITCH!
12
NP-DK50 DS-28_02-2021

Publicité

Table des Matières
loading

Table des Matières