How To Position The Weighing Pan And Set Up The Balance - Mettler Toledo PE200 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

PREPARATION: How to install the weighing pan and set up the balance
Installing the pan support and weighing pan is always done in the same manner, regardless of whether the in-use cover is installed or not.
Every PE balance provides reliable results, even under less than favorable environmental conditions.
However, it is best to select a location that is stable, and not exposed to sunshine or to drafts (fast, stable display).
Installing the weighing pan
– Place pan support (7) on conical peg (13).
– Place weighing pan (6) on pan support.
– Connect power cable (14).
Location
– Solid, vibration-free support.
– No excessive temperature fluctuations.
– Avoid exposure to direct sunlight.
– Avoid drafts.
If it is absolutely necessary to work under less favo-
rable conditions, consult section "ADDITIONAL
FEATURES: Switching the integration time".
Level indicator field installation kit
This level indicator field installation kit was developed
for PE balances which are moved frequently to new
locations. With the level indicator, the PE balance
can be leveled at every new location. Its efficiency is
therefore increased. The field installation kit contains
2 foot screws (28) and 1 level indicator (27).
METTLER TOLEDO Service can also be called on for
this installation. Order No. see page 14.
5

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Pe400Pe2000Pe4000

Table des Matières