L.B. White Boss 400 DF Manuel Du Propriétaire Et Directives D'installation page 25

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

IGNITION FAILURE SEQUENCE:
• The first trial for ignition takes approximately 10
seconds.
- If the first trial for ignition fails, the ignition control
attempts two more trial for ignition.
- A total of 30 seconds for all three trials for
ignition.
- If the ignition control does not sense burner flame
or if the flame is extinguished, the control shuts the
heater down and goes into safety lock-out.
- Gas solenoid valve closes.
- Ignition spark stops.
- Fan motor stops.
- To retry for ignition, reset the ignition control by:
- Unplugging the heater and plugging it back in.
OR
- Completely turning down the thermostat and then
turning it up.
Boss DF Construction Heaters
Owner's Manual • Boss DF
25

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Boss 1000 dfCh400Ch1000

Table des Matières